PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing safety net around 4th Floor Facing South (800x600).jpg Installing steel angles and safety cables (1) Facing North-East (800x600).jpg Installing steel angles and safety cables (2) Facing North-East (800x600).jpg Layed out gravel at Cafeteria (104), and Main Loby (102). Facing East (800x600).jpg Metal decking at 4th Floor Facing East (800x600).jpg Started fixing the main steel column Facing East  (800x600).jpg Started fixing the main steel column Facing South  (800x600).jpg Compacting around the foundation walls Facing South (800x600).jpg Installing underground piping at the boiler room Facing North  (800x600).jpg
Previous pageNext page Metal decking at 4th Floor Facing East (800x600)
Metal decking at 4th Floor Facing East (800x600)